A 80,000 lbs of steam per hour (@ 450psi) capacity boiler has been acquired by the Lincoln County Port Authority. With some retrofitting, the plant could produce up to 5 to 7 megawatts of electricity or a combination of steam and electricity. The boiler is fitted with an electrostatic precipitator. Upon request, the Port Authority can provide the Engineering study that evaluated the retrofit to produce power generation.
For more information, contact Brett McCully, Director of Operations at brett@krdc.net or Jim Mayo, Chairman LPCA Board at jim81873@gmail.com.